For more information about mud-water separation system, please visit: https://www.brightwaysolids.com/Slurry-Separation-Plant_d10
Productos
- Equipos de Control de sólidos
- Triple Deck Shale Shaker
- Zaranda de movimiento lineal
- Desgasificador de vacío
- Limpiador del fango
- Desarenador
- Desarenador
- Decantando la centrifugadora
- Sludge Vacuum Pump
- Secador de corte vertical
- Zaranda de secado
- Mezclador del fango del jet
- Agitador de lodo
- Bomba centrífuga
- Bomba del esquileo
- Bomba Slurry sumergible
- Arma del fango
- Separador de Gas del fango
- Dispositivo de encendido de fuego
- Bomba de tornillo
- Tanque de hidratación
- Tanque de lodo
- Sala de centro Control de motores
- Transportador de tornillo
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema de Control de sólidos
- Piezas de repuesto
Contacto
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casos
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
Noticias de la empresa
Shipment of Mud-water Separation System to Finland
2020-09-27
On September 16th, after completing the final series of inspection and commissioning procedures, a set of mud-water separation system of Brightway was officially hoisted and ready to be sent to Finland.
The mud-water separation system is mainly used to separate and treat the sludge produced by the sludge treatment system. In the early communication with customers, the technical engineers fully considered the customer’s site equipment configuration, sludge composition, separation requirements and other factors, and integrated the entire oil-based treatment system and the mud-water separation treatment system. The core separation equipment such as the cyclone desander, desilter, and shale shaker have been redesigned and optimized to improve the processing capacity and performance of the equipment. The system is designed to handle up to 120 cubic meters per hour, and can meet the needs of the customer’s on-site muddy water separation.
In the field of mud-water treatment, it is the goal pursued by Brightway to provide customers with efficient integrated solutions for oil sludge treatment. Summarize equipment application experience, continuously optimize and improve equipment, and improve equipment performance to meet users’ different usage scenarios and needs. At present, the mud-water separation system has been hoisted and will be sent to Shanghai Port. It is expected to arrive in Finland next month.
Anterior : Shipment of BWVP750 Sludge Vacuum Pump
Próxima :Happy Mid-Autumn Festival & Happy National Day 2020