Productos
- Equipos de Control de sólidos
- Triple Deck Shale Shaker
- Zaranda de movimiento lineal
- Desgasificador de vacío
- Limpiador del fango
- Desarenador
- Desarenador
- Decantando la centrifugadora
- Sludge Vacuum Pump
- Secador de corte vertical
- Zaranda de secado
- Mezclador del fango del jet
- Agitador de lodo
- Bomba centrífuga
- Bomba del esquileo
- Bomba Slurry sumergible
- Arma del fango
- Separador de Gas del fango
- Dispositivo de encendido de fuego
- Bomba de tornillo
- Tanque de hidratación
- Tanque de lodo
- Sala de centro Control de motores
- Transportador de tornillo
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema de Control de sólidos
- Piezas de repuesto
Contacto
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casos
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
Noticias de la empresa
Jidong Oilfield Drilling Waste Disposal System Delivery
2020-06-16
Recently, Brightway produced drilling waste disposal system for Jidong Oilfield affiliated units. This equipment includes 2 sets of vertical cuttings dryer and 3 sets of decanter centrifuge. The final installation and commissioning work is currently in progress and is expected to be delivered to customers in the short term.
Most of the drilling projects in Jidong Oilfield are located near the offshore areas and shrimp ponds. In order to protect the ecological environment, Jidong Oilfield has been actively advocating and practicing green drilling, and adopted corresponding environmental protection measures for each well in the drilling construction. Among them, for the waste drilling fluid generated by drilling and waste mud treatment, the oil field has invested a batch of special treatment equipment, namely drilling waste disposal system. The equipment that Brightway produced for customers this time is an important cooperation that helps the environmental protection construction of Jidong Oilfield.
At present, the decanter centrifuge has been completed, and the drill cuttings dryer project has been completed 90%, Brightway workers are doing the final installation and commissioning work, it is expected to be sent to the oilfield drilling site by the end of this month. Know more about oilfield environmental protection equipment or to consult drilling waste disposal system, please click the link:http://www.brightwaysolids.com/Drilling-Waste-Management_d13