Productos
- Equipos de Control de sólidos
- Triple Deck Shale Shaker
- Zaranda de movimiento lineal
- Desgasificador de vacío
- Limpiador del fango
- Desarenador
- Desarenador
- Decantando la centrifugadora
- Sludge Vacuum Pump
- Secador de corte vertical
- Zaranda de secado
- Mezclador del fango del jet
- Agitador de lodo
- Bomba centrífuga
- Bomba del esquileo
- Bomba Slurry sumergible
- Arma del fango
- Separador de Gas del fango
- Dispositivo de encendido de fuego
- Bomba de tornillo
- Tanque de hidratación
- Tanque de lodo
- Sala de centro Control de motores
- Transportador de tornillo
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema de Control de sólidos
- Piezas de repuesto
Contacto
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casos
-
3000hp Drilling Rig Circulation System for 9000m U...
3000hp Drilling Rig Circulation System for 9000m Ultra Deep Drilling Proj...
-
2000hp Drilling Rig Mud Tank System for Saudi Arab...
2000hp Drilling Rig Mud Tank System for Saudi Arabia As earl...
Noticias de la empresa
250GPM HDD Mud Recovery System Delivered To Customer
2021-01-21
On January 15, Brightway one set 250GPM HDD mud recovery system was officially delivered to a country in Southeast Asia.
The HDD mud recovery system is used to solve the mud treatment problem of the underground sewage pipe network project for the customer. According to the customer's construction site conditions, Brightway designed and customized this 250GPM HDD mud recovery system for customers. The system adopts the integrated double deck screen machine to meet the user's on-site mud treatment needs and reduce investment in other equipment, save construction cost. After operation, the capacity of system is up to 50-60 cubic meters per hour.
Brightway has worked with this customer many times, Customers have always recognized and trusted the mud treatment solutions and systems in the HDD drilling field of Brightway. At present, the system is expected to arrive at the customer's construction site at the end of next month for installation and operation.
Anterior :Delivery of 2 sets of Drilling Fluid Circulation System to customer